CryptoSlatecryptoNEUTRALMEDIUM

Soluna has 6.3 GW of data center projects on paper, only 192 MW are operating

Revenue still grew 73% excluding the presentation change, but only about 3% of the 6.3 GW pipeline was operating. The post Soluna has 6.3 GW of data center projects on paper, only 192 MW are operating appeared first on CryptoSlate.

Read at CryptoSlate